PICACHO RD over YUMA MAIN CANAL
0.16 M E/O WINTERHAVEN RD · County 025, California · Built 1925 · 2 Lanes · 6,500 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
32.735883, -114.624022
This bridge is in worse condition than 92.6% of bridges in County 025. The average bridge in California is 0 years old; this one is 101 years old.
Nearby Bridges
PICACHO RD over RESERVATION MAIN DRAIN
Built 1977
WINTERHAVEN DRIVE over CALIFORNIA WASTEWAY
Built 1955
INTERSTATE 8 EB over CALIFORNIA WASTEWAY
Built 1973
WINTERHAVEN DR over COLORADO RIVER
Built 1956
INTERSTATE 8 WB over CALIFORNIA WASTEWAY
Built 1973
WINTERHAVEN DRIVE over INTERSTATE 8
Built 1973
SB 8 over Colorado River
Built 1956
I 8 WB over Colo R Pentntry Av SPTCO
Built 1978
I 8 EB over Colo R Pentntry Av SPTCO
Built 1978
INTERSTATE 8 WB over COLORADO RI UP RR AMTRAK
Built 1978
Bridge Details
- Structure #
- 58C0028
- Year Built
- 1925
- Reconstructed
- 1947
- Length
- 40.5 m (132.9 ft)
- Max Span
- 5.8 m
- Width
- 9 m (29.5 ft)
- Lanes
- 2
- Daily Traffic
- 6,500
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $370,000
- Total Project Cost
- $621,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.