Baseline Avenue over CAP Canal
0.5 mi W of Ironwood Rd · County 021, Arizona · Built 1985 · 2 Lanes · 9,629 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.3788, -111.572903
This bridge is in worse condition than 68.2% of bridges in County 021. The average bridge in Arizona is 0 years old; this one is 41 years old.
Nearby Bridges
US 60 over Wash
Built 1990
Meridian Road over US 60 & CAP CANAL
Built 1985
US 60 over CAP Canal
Built 1985
US 60 over Ironwood Drive
Built 1990
Ironwood Drive over CAP Canal
Built 2008
Southern Ave over Wash
Built 1991
US 60 over Drainage Channel
Built 1990
US 60 over Wash
Built 1990
Meridian Rd over Wash
Built 2013
Southern Ave over CAP Canal (Mesa)
Built 1986
Bridge Details
- Structure #
- 08834
- Year Built
- 1985
- Length
- 34.7 m (113.8 ft)
- Max Span
- 9.4 m
- Lanes
- 2
- Daily Traffic
- 9,629
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.