Meridian Road over US 60 & CAP CANAL

22.4 mi E Jct I-10 · County 013, Arizona · Built 1985 · 4 Lanes · 7,296 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
01438
Year Built
1985
Length
125.6 m (412.1 ft)
Max Span
31.1 m
Width
19.6 m (64.3 ft)
Lanes
4
Daily Traffic
7,296
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,000
Total Project Cost
$3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.