US 60 over Wash
23.9 mi E Jct I-10 · County 021, Arizona · Built 1990 · 4 Lanes · 45,213 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
33.3866, -111.5549
This bridge is in worse condition than 77.4% of bridges in County 021. The average bridge in Arizona is 0 years old; this one is 36 years old.
Nearby Bridges
US 60 over Idaho Road
Built 1990
US 60 over Ironwood Drive
Built 1990
US 60 over Weeks Wash
Built 1990
US 60 over Wash
Built 1990
Ironwood Drive over Wash
Built 1987
Baseline Avenue over Weeks Wash Channel
Built 1990
Baseline Avenue over CAP Canal
Built 1985
Southern Ave over Wash
Built 1991
Ironwood Drive over CAP Canal
Built 2008
US 60 over CAP Canal
Built 1985
Bridge Details
- Structure #
- 06918
- Year Built
- 1990
- Length
- 6.4 m (21 ft)
- Max Span
- 3 m
- Lanes
- 4
- Daily Traffic
- 45,213
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.