Baseline Avenue over Weeks Wash Channel
0.45 mi E of Jct Idaho Rd · County 021, Arizona · Built 1990 · 2 Lanes · 4,918 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.378869, -111.537517
This bridge is in worse condition than 68.2% of bridges in County 021. The average bridge in Arizona is 0 years old; this one is 36 years old.
Nearby Bridges
US 60 over Weeks Wash
Built 1990
US 60 over Tomahawk Road
Built 1991
US 60 over Idaho Road
Built 1990
US 60 over Wash
Built 1990
US 60 over Wash
Built 1990
US 60 over Goldfield Road
Built 1990
US 60 over Ironwood Drive
Built 1990
Ironwood Drive over CAP Canal
Built 2008
Old W Hwy - EB over Wash
Built 1930
Old W Hwy - WB over Wash
Built 1964
Bridge Details
- Structure #
- 07727
- Year Built
- 1990
- Length
- 19.2 m (63 ft)
- Max Span
- 18.6 m
- Width
- 12.1 m (39.7 ft)
- Lanes
- 2
- Daily Traffic
- 4,918
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.