Ave 7E over B Canal
0.1 mi N Jct 32nd St · County 027, Arizona · Built 1991 · 3 Lanes · 220 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
32.6719, -114.5128
This bridge is in worse condition than 36.6% of bridges in County 027. The average bridge in Arizona is 0 years old; this one is 35 years old.
Nearby Bridges
SR 195 / Araby Rd over B Lateral Canal
Built 1971
I-8 EB over SR 195 / Araby Rd
Built 1968
I 8; EB over Fortuna SPRR
Built 1968
I-8 WB over SR 195 / Araby Road
Built 1968
I 8; WB over Fortuna SPRR
Built 1968
32nd Street over A Canal
Built 2002
Ave 6E over B Canal
Built 1991
30th Street over Gila Gravity Main Canal
Built 2006
I-8; EB over SR B8 & Canal
Built 1968
I-8 WB over SR B8 & Canal
Built 1968
Bridge Details
- Structure #
- 07721
- Year Built
- 1991
- Length
- 12.5 m (41 ft)
- Max Span
- 11.6 m
- Width
- 14.6 m (47.9 ft)
- Lanes
- 3
- Daily Traffic
- 220
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.