SR 195 / Araby Rd over B Lateral Canal
0.42 mi S Jct I-8 · County 027, Arizona · Built 1971 · 5 Lanes · 15,309 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
32.6709, -114.5215
This bridge is in worse condition than 59.5% of bridges in County 027. The average bridge in Arizona is 0 years old; this one is 55 years old.
Nearby Bridges
I-8 EB over SR 195 / Araby Rd
Built 1968
I-8 WB over SR 195 / Araby Road
Built 1968
Ave 6E over B Canal
Built 1991
Ave 7E over B Canal
Built 1991
I 8; EB over Fortuna SPRR
Built 1968
I 8; WB over Fortuna SPRR
Built 1968
32nd Street over A Canal
Built 2002
Ave 5E over B Canal
Built 1991
30th Street over Gila Gravity Main Canal
Built 2006
Ave 5E over S Gila Canal
Built 1991
Bridge Details
- Structure #
- 02963
- Year Built
- 1971
- Reconstructed
- 2008
- Length
- 11.6 m (38.1 ft)
- Max Span
- 11 m
- Width
- 39.6 m (129.9 ft)
- Lanes
- 5
- Daily Traffic
- 15,309
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.