I-8 WB over SR 195 / Araby Road
5.5 mi E Jct US 95 · County 027, Arizona · Built 1968 · 2 Lanes · 19,851 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
32.6778, -114.5217
This bridge is in worse condition than 88.2% of bridges in County 027. The average bridge in Arizona is 0 years old; this one is 58 years old.
Nearby Bridges
I-8 EB over SR 195 / Araby Rd
Built 1968
SR 195 / Araby Rd over B Lateral Canal
Built 1971
Ave 6E over B Canal
Built 1991
Ave 7E over B Canal
Built 1991
I 8; EB over Fortuna SPRR
Built 1968
I 8; WB over Fortuna SPRR
Built 1968
32nd Street over A Canal
Built 2002
Ave 5E over S Gila Canal
Built 1991
Ave 5E over B Canal
Built 1991
30th Street over Gila Gravity Main Canal
Built 2006
Bridge Details
- Structure #
- 01278
- Year Built
- 1968
- Length
- 44.8 m (147 ft)
- Max Span
- 15.8 m
- Width
- 12.4 m (40.7 ft)
- Lanes
- 2
- Daily Traffic
- 19,851
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.