I 19; SB over Sopori Wash

22.0 mi N Jct SR 289 · County 023, Arizona · Built 1977 · 3 Lanes · 11,067 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
01744
Year Built
1977
Length
69.5 m (228 ft)
Max Span
25.9 m
Width
19.1 m (62.7 ft)
Lanes
3
Daily Traffic
11,067
Material
Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.