I 19; WFR over Sopori River
0.3 mi S Jct Arivaca Rd · County 023, Arizona · Built 1929 · 2 Lanes · 200 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
31.7219, -111.0623
This bridge is in worse condition than 65.7% of bridges in County 023. The average bridge in Arizona is 0 years old; this one is 97 years old.
Nearby Bridges
I 19; SB over Sopori Wash
Built 1977
I 19; NB over Sopori Wash
Built 1977
I 19; E Fr Rd over Sopori Wash
Built 1977
I 19; SB over Arivaca Road
Built 1977
I 19; NB over Arivaca Road
Built 1977
I 19; W Fr Rd over Old Junction Wash
Built 1932
I 19; SB over Old Junction Wash
Built 1977
I 19; NB over Old Junction Wash
Built 1977
I 19; E Fr Rd over Old Junction Wash
Built 1977
I 19; Frontage Rd over Tinaja Wash
Built 1932
Bridge Details
- Structure #
- 00404
- Year Built
- 1929
- Reconstructed
- 1953
- Length
- 57.9 m (190 ft)
- Max Span
- 11 m
- Width
- 13.5 m (44.3 ft)
- Lanes
- 2
- Daily Traffic
- 200
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.