I 19; NB over Sopori Wash

22.0 mi N Jct SR 289 · County 023, Arizona · Built 1977 · 2 Lanes · 11,086 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
01743
Year Built
1977
Length
71.3 m (233.9 ft)
Max Span
25.9 m
Width
13.9 m (45.6 ft)
Lanes
2
Daily Traffic
11,086
Material
Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.