IRR BIA ROUTE 1 over TYSON WASH
1.6KM S OF BIA 1/56 INTER · County 012, Arizona · Built 2022 · 2 Lanes · 1,900 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
33.749667, -114.468583
This bridge is in worse condition than 66.3% of bridges in County 012. The average bridge in Arizona is 0 years old; this one is 4 years old.
Nearby Bridges
IRR BIA ROUTE 1 over TYSON WATERWAY
Built 1958
IRR BIA RTE 60 over MAIN DRAIN
Built 1955
IRR BIA RTE 56 over MAIN DRAIN
Built 1968
IRR BIA RTE 1 over MESA DRAIN
Built 1953
IRR BIA RTE 60 over USBR DRAIN
Built 1953
IRR BIA RTE 56 over USBR DRAIN
Built 1968
IRR BIA RTE 50 over MAIN DRAIN
Built 1968
IRR BIA RTE 50 over USBR MAIN DRAIN
Built 1954
US HIGHWAY 95 over C"" CANAL
Built 1955
IRR BIA RTE 44 over MAIN DRAIN
Built 1963
Bridge Details
- Structure #
- 0000H51603B0260
- Year Built
- 2022
- Length
- 182.9 m (600.1 ft)
- Max Span
- 29.9 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 1,900
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.