IRR BIA ROUTE 1 over TYSON WATERWAY

1.6 KM S OF BIA 1/56 INT. · County 012, Arizona · Built 1958 · 2 Lanes · 1,700 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
00000000000H008
Year Built
1958
Length
28.4 m (93.2 ft)
Max Span
9.1 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
1,700
Material
Concrete Continuous
Design
Slab
Owner
Bureau of Indian Affairs
Last Inspected
N/A
Est. Improvement
$1,370,000
Total Project Cost
$1,955,000