IRR BIA RTE 56 over USBR DRAIN

3 KM WEST OF BIA 1 · County 012, Arizona · Built 1968 · 2 Lanes · 55 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
00000000000H033
Year Built
1968
Length
22.6 m (74.1 ft)
Max Span
7.5 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
55
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
Bureau of Indian Affairs
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$72,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.