SEWARD HIGHWAY over TWENTY MILE RIVER

MILE POINT 79.9 · County 020, Alaska · Built 2023 · 2 Lanes · 5,200 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
0634
Year Built
2023
Length
198.9 m (652.6 ft)
Max Span
38.7 m
Width
16.5 m (54.1 ft)
Lanes
2
Daily Traffic
5,200
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.