SEWARD HIGHWAY over PLACER RIVER MAIN CROSS

MILE POINT 77.5 · County 020, Alaska · Built 2023 · 3 Lanes · 3,900 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
0629
Year Built
2023
Length
182.4 m (598.4 ft)
Max Span
35.5 m
Width
20.2 m (66.3 ft)
Lanes
3
Daily Traffic
3,900
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.