SEWARD HIGHWAY over PORTAGE CREEK NO 1

MILE POINT 78.1 · County 020, Alaska · Built 2023 · 4 Lanes · 5,080 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
0630
Year Built
2023
Length
88.7 m (291 ft)
Max Span
28.5 m
Width
25 m (82 ft)
Lanes
4
Daily Traffic
5,080
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.