SEWARD HIGHWAY over INGRAM CREEK

MILE POINT 74.3 · County 122, Alaska · Built 1985 · 2 Lanes · 3,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
0620
Year Built
1985
Length
52.1 m (170.9 ft)
Max Span
25.6 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
3,900
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.