AL-25 over Waxahatchee Creek

AL-25 * Waxahatchee Creek · County 117, Alabama · Built 2023 · 2 Lanes · 3,202 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
021584
Year Built
2023
Length
73.2 m (240.2 ft)
Max Span
36.6 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
3,202
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,173,000
Total Project Cost
$2,390,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.