AL 25 over BRANCH

1.5 MI NO CO RD 42 · County 117, Alabama · Built 1928 · 2 Lanes · 3,300 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
000518
Year Built
1928
Length
9.1 m (29.9 ft)
Max Span
3 m
Lanes
2
Daily Traffic
3,300
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$456,000
Total Project Cost
$502,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.