AL - 25 over CAMP BRANCH
4.7 MI. N. I-65 · County 117, Alabama · Built 1928 · 2 Lanes · 3,208 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
33.143819, -86.679714
This bridge is in worse condition than 86% of bridges in County 117. The average bridge in Alabama is 0 years old; this one is 98 years old.
Nearby Bridges
CO. HWY. 42 over S. FORK CAMP BRANCH
Built 1992
AL 25 over BRANCH
Built 1928
CO. HWY. 42 over CAMP BRANCH
Built 1967
CR 97 over UT TO CAMP BRANCH
Built 2003
AL-25 over Waxahatchee Creek
Built 2023
AL - 70 over WAXAHATCHEE CREEK
Built 2007
COUNTY ROAD 86 over LONG BRANCH
Built 2002
ATCHISON TRACE over BIG CREEK
Built 1935
CO. HWY. 42 over CAMP BRANCH
Built 1971
AL - 70 over BRANCH
Built 1966
Bridge Details
- Structure #
- 000517
- Year Built
- 1928
- Length
- 48.5 m (159.1 ft)
- Max Span
- 7.3 m
- Width
- 6.4 m (21 ft)
- Lanes
- 2
- Daily Traffic
- 3,208
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $844,000
- Total Project Cost
- $928,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.