AL - 25 over CAMP BRANCH

4.7 MI. N. I-65 · County 117, Alabama · Built 1928 · 2 Lanes · 3,208 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000517
Year Built
1928
Length
48.5 m (159.1 ft)
Max Span
7.3 m
Width
6.4 m (21 ft)
Lanes
2
Daily Traffic
3,208
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$844,000
Total Project Cost
$928,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.