CO. HWY. 42 over S. FORK CAMP BRANCH

0.2 MI E ST. 25 · County 117, Alabama · Built 1992 · 2 Lanes · 1,588 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
015598
Year Built
1992
Length
7.2 m (23.6 ft)
Max Span
3.4 m
Lanes
2
Daily Traffic
1,588
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$510,000
Total Project Cost
$561,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.