_RAMP TO 6TH AVE. over _I-65 NB & RAMP

I-65 AT 6TH AVE N. · County 073, Alabama · Built 2017 · 1 Lanes · 2,017 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
021141
Year Built
2017
Length
433.1 m (1420.9 ft)
Max Span
58.2 m
Width
8.4 m (27.6 ft)
Lanes
1
Daily Traffic
2,017
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,019,000
Total Project Cost
$8,821,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.