11TH AVE RAMP I-65 over I-65 I-20 I-59

I-20 59 65 · County 073, Alabama · Built 2018 · 1 Lanes · 2,017 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
021144
Year Built
2018
Length
1648.4 m (5408.1 ft)
Max Span
79.2 m
Width
8.4 m (27.6 ft)
Lanes
1
Daily Traffic
2,017
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$30,517,000
Total Project Cost
$33,569,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.