I - 65 over 4TH. AVE. NORTH

I65*4TH. AVE. NORTH · County 073, Alabama · Built 1969 · 8 Lanes · 136,580 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
014392
Year Built
1969
Reconstructed
1988
Length
54.7 m (179.5 ft)
Max Span
25.1 m
Width
42.4 m (139.1 ft)
Lanes
8
Daily Traffic
136,580
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,202,000
Total Project Cost
$6,822,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.