I-65 17TH ST RAMP over 15th St. & 16th St.

I-65 17TH STREET RAMP · County 073, Alabama · Built 2018 · 2 Lanes · 2,018 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
021151
Year Built
2018
Length
886.4 m (2908.1 ft)
Max Span
48.8 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
2,018
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$16,410,000
Total Project Cost
$18,051,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.