RAMP TO 17TH ST over I-20/59

I 20 / 59 RAMP TO 17TH ST · County 073, Alabama · Built 2018 · 1 Lanes · 2,018 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
021147
Year Built
2018
Length
605.3 m (1985.9 ft)
Max Span
91.4 m
Width
9.1 m (29.9 ft)
Lanes
1
Daily Traffic
2,018
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$12,037,000
Total Project Cost
$13,241,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.