I65 rmp to 17th St over I - 65 NORTH

I-65 * I-2059 Interchange · County 073, Alabama · Built 2018 · 1 Lanes · 4,965 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
021143
Year Built
2018
Length
97.6 m (320.2 ft)
Max Span
36.7 m
Width
8.4 m (27.6 ft)
Lanes
1
Daily Traffic
4,965
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,981,000
Total Project Cost
$2,179,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.