BOYD ROAD over DUNN CREEK

6.6 MI N OF JCT US NO 82 · County 125, Alabama · Built 2009 · 2 Lanes · 120 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
019643
Year Built
2009
Length
48.8 m (160.1 ft)
Max Span
12.2 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
120
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,211,000
Total Project Cost
$1,332,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.