UPPER COLUMBUS RD over CLEVELAND CREEK

1.1 MI NW OF JCT CO 15 · County 125, Alabama · Built 1993 · 2 Lanes · 300 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
011327
Year Built
1993
Length
10.4 m (34.1 ft)
Max Span
10.4 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
300
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$351,000
Total Project Cost
$386,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.