UPPER COLUMBUS RD. over SIPSEY RIVER

9.8 MI. NW JCT. US NO. 82 · County 125, Alabama · Built 2000 · 2 Lanes · 750 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
018218
Year Built
2000
Length
88 m (288.7 ft)
Max Span
24 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
750
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,011,000
Total Project Cost
$2,212,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.