UPPER COLUMBUS RD over SIPSEY RIVER RELIEF

9.5 MI NW JCT US 82 · County 125, Alabama · Built 1996 · 2 Lanes · 400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
016489
Year Built
1996
Length
41.5 m (136.2 ft)
Max Span
10.4 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
400
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,051,000
Total Project Cost
$1,156,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.