UPPER COLUMBUS RD. over SIPSEY RIVER RELIEF BRG.
7.6 MI. NW U.S.82 · County 125, Alabama · Built 1999 · 2 Lanes · 400 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
33.335447, -87.753981
This bridge is in worse condition than 62% of bridges in County 125. The average bridge in Alabama is 0 years old; this one is 27 years old.
Nearby Bridges
UPPER COLUMBUS RD. over SIPSEY RIVER RELIEF
Built 1993
UPPER COLUMBUS RD. over TRIBUTARY OF BIG CREEK
Built 1960
UPPER COLUMBUS RD over SIPSEY RIVER RELIEF
Built 1996
UPPER COLUMBUS RD. over SIPSEY RIVER
Built 2000
UPPER COLUMBUS RD over SIPSEY VALLEY RELIEF
Built 1996
UPPER COLUMBUS RD. over SIPSEY RIVER RELIEF
Built 1999
BOYD ROAD over CLEVELAND CREEK
Built 1979
SHELLY HUGHES ROAD over MILL CREEK
Built 1968
SHELLY HUGHES RD. over WARDS MILLS CREEK
Built 1994
UPPER COLUMBUS RD. over Wards Mill Creek
Built 1951
Bridge Details
- Structure #
- 017679
- Year Built
- 1999
- Length
- 31.1 m (102 ft)
- Max Span
- 10.4 m
- Width
- 9.3 m (30.5 ft)
- Lanes
- 2
- Daily Traffic
- 400
- Material
- Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $815,000
- Total Project Cost
- $897,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.