BROWNVILLE PIKE RD over SIPSEY RIVER (M.C.)

1.5MI NE OF CO RD 75 · County 125, Alabama · Built 2005 · 2 Lanes · 50 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
018304
Year Built
2005
Length
88.4 m (290 ft)
Max Span
39.6 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
50
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,087,000
Total Project Cost
$2,296,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.