BOYD ROAD over MCDANIEL BRANCH
.8 MI. N INT BVILLE PIKE · County 125, Alabama · Built 2000 · 2 Lanes · 100 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.40305, -87.791778
This bridge is in worse condition than 38.5% of bridges in County 125. The average bridge in Alabama is 0 years old; this one is 26 years old.
Nearby Bridges
BROWNVILLE PIKE over REL 1 BR FOR SIPSEY RIV
Built 2003
BOYD ROAD over COTTON CREEK
Built 2000
BROWNVILLE PIKE over REL 2 BR FOR SIPSEY RV.
Built 2003
BROWNVILLE PIKE RD over SIPSEY RIVER (M.C.)
Built 2005
BROWNVILLE PIKE RD over REL 3 BR FOR SIPSEY RIV
Built 2006
ROBERTSON ROAD over DUNNS CREEK
Built 2002
BROWNVILLE PIKE RD over REL 4 BR FOR SIPSEY RIV
Built 2006
BROWNVILLE PIKE RD over REL 5 BR FOR SIPSEY RIV
Built 2009
COOPER ROAD over DUNN CREEK
Built 2005
BOYD ROAD over DUNN CREEK
Built 2009
Bridge Details
- Structure #
- 018020
- Year Built
- 2000
- Length
- 10.4 m (34.1 ft)
- Max Span
- 10.4 m
- Width
- 9.3 m (30.5 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $351,000
- Total Project Cost
- $386,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.