AL. 158 E.B. over COLLEGE PARKWAY

1.7 MI. E US 45 · County 097, Alabama · Built 2005 · 2 Lanes · 13,067 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
018562
Year Built
2005
Length
50.5 m (165.7 ft)
Max Span
25.3 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
13,067
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,747,000
Total Project Cost
$1,922,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.