I-65 NB over SR 158 * SR 213

I-65 @ SR 158 * SR 213 · County 097, Alabama · Built 1967 · 2 Lanes · 34,736 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
009268
Year Built
1967
Length
75.3 m (247 ft)
Max Span
18.9 m
Width
10.2 m (33.5 ft)
Lanes
2
Daily Traffic
34,736
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,935,000
Total Project Cost
$2,129,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.