SR 213 over CHICKASAW CREEK

1.5 MI E JCT US 45 · County 097, Alabama · Built 2003 · 2 Lanes · 4,029 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
017912
Year Built
2003
Length
253.9 m (833 ft)
Max Span
41.1 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
4,029
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,008,000
Total Project Cost
$8,809,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.