AL. 158 W.B. over US. 45

US 45 @ AL. 158 · County 097, Alabama · Built 2007 · 2 Lanes · 7,816 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
018560
Year Built
2007
Length
75.4 m (247.4 ft)
Max Span
38.1 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
7,816
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,466,000
Total Project Cost
$2,713,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.