VIADUCT RD over B-N * N-S RR SOUTH ST
0.2 MI E US 43 · County 097, Alabama · Built 2001 · 2 Lanes · 707 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
30.763886, -88.073283
This bridge is in worse condition than 55.8% of bridges in County 097. The average bridge in Alabama is 0 years old; this one is 25 years old.
Nearby Bridges
HAIG ST over DRAINAGE DITCH
Built 1968
THOMPSON BLVD over I65
Built 1965
E PETAIN ST over DRAINAGE DITCH
Built 1962
WEST LEE ST over I65
Built 1980
US 43 over CHICKASABOGUE CREEK
Built 1986
I-65 over GUM TREE BRANCH
Built 1965
I-165 NB over MULTIPLE STREETS STREAMS
Built 1994
I-165 NB TO I65 NB over I-65 * GUM TREE BRANCH
Built 1993
I-165 SB over MULTIPLE STREETS STREAMS
Built 1994
I-65 SB TO I165 SB over I-65 * GUM TREE BRANCH
Built 1993
Bridge Details
- Structure #
- 018250
- Year Built
- 2001
- Length
- 139.3 m (457 ft)
- Max Span
- 26.8 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 707
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,636,000
- Total Project Cost
- $4,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.