I-165 NB TO I65 NB over I-65 * GUM TREE BRANCH

I-165 * I-65 INTERCHANGE · County 097, Alabama · Built 1993 · 2 Lanes · 12,034 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
015588
Year Built
1993
Length
414.8 m (1360.9 ft)
Max Span
23.5 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
12,034
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$11,947,000
Total Project Cost
$13,142,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.