I-165 NB over MULTIPLE STREETS STREAMS

DN TWN MOB TO CHICKASAW · County 097, Alabama · Built 1994 · 3 Lanes · 21,946 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
015508
Year Built
1994
Length
7471.6 m (24513.1 ft)
Max Span
59.7 m
Width
17.9 m (58.7 ft)
Lanes
3
Daily Traffic
21,946
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$297,147,000
Total Project Cost
$326,862,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.