I-165 SB over MULTIPLE STREETS STREAMS

CHICKASAW TO DWN TWN MOB · County 097, Alabama · Built 1994 · 3 Lanes · 21,946 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
015574
Year Built
1994
Length
7417 m (24334 ft)
Max Span
59.7 m
Width
17.9 m (58.7 ft)
Lanes
3
Daily Traffic
21,946
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$294,977,000
Total Project Cost
$324,475,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.