US 82 over SIPSEY RIVER

4.9 MI. E TUSC CO. LINE · County 125, Alabama · Built 2004 · 2 Lanes · 12,687 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
018064
Year Built
2004
Length
91.4 m (299.9 ft)
Max Span
39.6 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
12,687
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,911,000
Total Project Cost
$3,202,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.