US 82 over SIPSEY RIVER RELIEF #4

0.2 MI. W OF SIPSEY RV. · County 125, Alabama · Built 2004 · 2 Lanes · 6,070 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
018063
Year Built
2004
Length
50 m (164 ft)
Max Span
12.5 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
6,070
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,732,000
Total Project Cost
$1,905,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.