US 82 over SIPSEY RIVER RELIEF

0.9 MI W SISPEY RIVER · County 125, Alabama · Built 2010 · 2 Lanes · 6,070 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
019914
Year Built
2010
Length
77.6 m (254.6 ft)
Max Span
25.8 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
6,070
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,528,000
Total Project Cost
$2,781,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.