SWEENY HOLLOW RD over DRY BRANCH

1.0MI SE AL HWY 75 · County 073, Alabama · Built 1995 · 2 Lanes · 8,280 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
016695
Year Built
1995
Length
11 m (36.1 ft)
Max Span
3.2 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
8,280
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$379,000
Total Project Cost
$417,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.