AL - 75 over BRANCH @ SWEENEY HOLLOW

AL 75 @ PINSON · County 073, Alabama · Built 2000 · 4 Lanes · 16,290 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
017990
Year Built
2000
Length
20.7 m (67.9 ft)
Max Span
5.2 m
Width
19 m (62.3 ft)
Lanes
4
Daily Traffic
16,290
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,720,000
Total Project Cost
$1,892,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.