AL - 79 SOUTH over ABANDONED RR

PINSON · County 073, Alabama · Built 1983 · 2 Lanes · 10,110 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
013040
Year Built
1983
Length
107.3 m (352 ft)
Max Span
24.4 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
10,110
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,428,000
Total Project Cost
$3,771,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.