FLYNT LANE over DRY BRANCH

200 E HWY 75 · County 073, Alabama · Built 1985 · 2 Lanes · 143 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
013547
Year Built
1985
Length
19.2 m (63 ft)
Max Span
18.3 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
143
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$582,000
Total Project Cost
$640,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.